Differential type dry pipe valve
The Loss Prevention Certification Board (LPCB part of BRE Global) sets the standards needed to ensure that fire and security products and services perform effectively. LPCB’s Loss Prevention Standards (LPS) are applied in fire and security sectors around the world.
LPS 1041 – 1.3, Requirements and testing procedures for the LPCB approval and listing of dry pipe valve sets, published by BRE Global in 2014, suggests that a differential type dry pipe valve is a: ‘Type of dry pipe valve in which the air seat of the sealing assembly is of large diameter relative to the diameter of the water seat of the sealing assembly, with the two separated by an intermediate chamber maintained at atmospheric pressure.’
[edit] Related articles on Designing Buildings Wiki
- BRE articles on Designing Buildings Wiki.
- Clapper.
- Differential ratio of a wet alarm valve.
- Drenchers.
- K factor.
- Making the case for sprinklers and dispelling myths.
- Mechanical type dry pipe valve.
- Overview of automatic sprinkler system design and operation.
- Sprinkler systems explained: A guide to sprinkler installation standards and rules.
- Sprinkler.
- The cost efficiency of different combinations of fire protection measures.
- The impact of automatic sprinklers on building design.
- Watermist systems for fire protection in domestic and residential buildings DG 534.
- Wet alarm valve.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.